Our team of experienced experts will help you complete construction at the best price and make sure your project stays on track. With experienced staff members and expertise in construction management and construction cost estimating, we manage our clients’ construction costs at all design stages and for all construction disciplines.

Healthcare

The Fort HealthCare Operating Rooms was a healthcare project in Fort Atkinson, WI. Completed in 2010, the 60,000 sq. ft. plan had an estimated budget of $10,000,000. This project included a renovation of the O/R rooms, labs and pharmacy area in the main hospital. Provided Cost Estimating, Budgeting and Change Order Review.

The Milwaukee VA Fisher House was a healthcare project in Milwaukee, WI. Completed in 2014, the 20,000 sq. ft. plan had an estimated budget of $800,000. Provided Value Engineering and Cost Estimating services for the civil and utility work required for the addition of the Fisher House.

The Fort HealthCare Hospital was a healthcare project in Fort Atkinson, WI. Completed in 2019, the 400,000 sq. ft. plan had an estimated budget of $100,000,000. Campus Regeneration Study: Provided Conceptual Cost Estimates for the potential re-location of a rural hospital.

The Prescott VA Medical Center was a healthcare project in Prescott, AZ. Completed in 2016, the 2,000 sq. ft. plan had an estimated budget of $3,400,000. Provided Feasibility Studies and Cost Estimating services for the replacement of campus’ emergency power systems.

The Amarillo VA Medical Center was a healthcare project in Amarillo, TX. Completed in 2016, the 45,000 sq. ft. plan had an estimated budget of $8,000,000. Provided Value Engineering and Cost Estimating services for all phases of the campus’ community based living center.

The Ann Arbor VA Medical Center was a healthcare project in Ann Arbor, MI. Completed in 2016, the 40,000 sq. ft. plan had an estimated budget of $7,800,000. Provided Cost Estimating services and phasing review for the renovation and expansion of the facilities front entrance and outpatient clinic areas.

The St. Joe’s Medical Center was a healthcare project in Hobart, Indiana. Completed in 2015, the 60,000 sq. ft. plan had an estimated budget of $23,000,000. Provided Feasibility Studies and Cost Engineering Solutions for the expansion of the facilities operating and emergency departments.

The Madison VA ICU was a healthcare project in Madison, WI. Completed in 2015, the 30,000 sq. ft. plan had an estimated budget of $8,000,000. Provided General Contracting services for the $8 Million ICU consolidation and expansion project.

The Milwaukee VA Medical Center was a healthcare project in Milwaukee, WI. Completed in 2015, the 15,000 sq. ft. plan had an estimated budget of $2,300,000. Worked with the Owner and Contractor to provide cost loaded critical path schedules for the multi-phased prosthetics renovation.

The Milwaukee VA Generator was a healthcare project in Milwaukee, WI. Completed in 2015, the 1,200 sq. ft. plan had an estimated budget of $4,000,000. This project consisted of the addition of Building 144’s Generator Facility. Provided Cost Estimating services.

The Syracuse VA Medical Center was a healthcare project in Syracuse, NY. Completed in 2015, the 20,000 sq. ft. plan had an estimated budget of $9,000,000. Throughout the development and construction design phases of the 4th floor renovation of the community based living center,we provided Cost Estimating services.

The Tomah VA Medical Center was a healthcare project in Tomah, WI. Completed in 2014, the 20,000 sq. ft. plan had an estimated budget of $400,000. Provided critical path schedules for the design team on the Water Meter Integration Project.

The Madison VA Medical Center was a healthcare project in Madison, WI. Completed in 2014, the In excess of 100,000 sq. ft. plan had an estimated budget of $10,000,000+. Engaged by the design team. Provided critical path schedules on the various projects as part of the 2013 IDIQ.

The Madison VA IDIQ was a healthcare project in Madison, WI. Completed in 2014, the in excess of 100,000 sq. ft. plan had an estimated budget of $10,000,000. Provided Cost Estimating services for $15 Million worth of projects during the 2013 IDIQ program.

The Wisconsin Veterans Home was a healthcare project in Chain O’ Lakes-King, WI. Completed in 2014, the 2,000 sq. ft. plan had an estimated budget of $3,400,000. Provided Cost Estimating for the pedestrian circulation study, and subsequent addition and renovation of elevators at (4) of the campuses buildings.

The Fort HealthCare Operating Rooms was a healthcare project in Fort Atkinson, WI. Completed in 2010, the 60,000 sq. ft. plan had an estimated budget of $10,000,000. This project included a renovation of the O/R rooms, labs and pharmacy area in the main hospital. Provided Cost Estimating, Budgeting and Change Order Review.

The Wisconsin Veterans Home was a healthcare project in Chain O’ Lakes-King, WI. Completed in 2014, the 2,000 sq. ft. plan had an estimated budget of $3,400,000. Provided Cost Estimating for the pedestrian circulation study, and subsequent addition and renovation of elevators at (4) of the campuses buildings.