The Fort HealthCare Operating Rooms was a healthcare project in Fort Atkinson, WI. Completed in 2010, the 60,000 sq. ft. plan had an estimated budget of $10,000,000. This project included a renovation of the O/R rooms, labs and pharmacy area in the main hospital. Provided Cost Estimating, Budgeting and Change Order Review.
The Milwaukee VA Fisher House was a healthcare project in Milwaukee, WI. Completed in 2014, the 20,000 sq. ft. plan had an estimated budget of $800,000. Provided Value Engineering and Cost Estimating services for the civil and utility work required for the addition of the Fisher House.
The Fort HealthCare Hospital was a healthcare project in Fort Atkinson, WI. Completed in 2019, the 400,000 sq. ft. plan had an estimated budget of $100,000,000. Campus Regeneration Study: Provided Conceptual Cost Estimates for the potential re-location of a rural hospital.
The Prescott VA Medical Center was a healthcare project in Prescott, AZ. Completed in 2016, the 2,000 sq. ft. plan had an estimated budget of $3,400,000. Provided Feasibility Studies and Cost Estimating services for the replacement of campus’ emergency power systems.
The Amarillo VA Medical Center was a healthcare project in Amarillo, TX. Completed in 2016, the 45,000 sq. ft. plan had an estimated budget of $8,000,000. Provided Value Engineering and Cost Estimating services for all phases of the campus’ community based living center.
The Ann Arbor VA Medical Center was a healthcare project in Ann Arbor, MI. Completed in 2016, the 40,000 sq. ft. plan had an estimated budget of $7,800,000. Provided Cost Estimating services and phasing review for the renovation and expansion of the facilities front entrance and outpatient clinic areas.
The St. Joe’s Medical Center was a healthcare project in Hobart, Indiana. Completed in 2015, the 60,000 sq. ft. plan had an estimated budget of $23,000,000. Provided Feasibility Studies and Cost Engineering Solutions for the expansion of the facilities operating and emergency departments.
The Madison VA ICU was a healthcare project in Madison, WI. Completed in 2015, the 30,000 sq. ft. plan had an estimated budget of $8,000,000. Provided General Contracting services for the $8 Million ICU consolidation and expansion project.
The Milwaukee VA Medical Center was a healthcare project in Milwaukee, WI. Completed in 2015, the 15,000 sq. ft. plan had an estimated budget of $2,300,000. Worked with the Owner and Contractor to provide cost loaded critical path schedules for the multi-phased prosthetics renovation.
The Milwaukee VA Generator was a healthcare project in Milwaukee, WI. Completed in 2015, the 1,200 sq. ft. plan had an estimated budget of $4,000,000. This project consisted of the addition of Building 144’s Generator Facility. Provided Cost Estimating services.
The Syracuse VA Medical Center was a healthcare project in Syracuse, NY. Completed in 2015, the 20,000 sq. ft. plan had an estimated budget of $9,000,000. Throughout the development and construction design phases of the 4th floor renovation of the community based living center,we provided Cost Estimating services.
The Tomah VA Medical Center was a healthcare project in Tomah, WI. Completed in 2014, the 20,000 sq. ft. plan had an estimated budget of $400,000. Provided critical path schedules for the design team on the Water Meter Integration Project.
The Madison VA Medical Center was a healthcare project in Madison, WI. Completed in 2014, the In excess of 100,000 sq. ft. plan had an estimated budget of $10,000,000+. Engaged by the design team. Provided critical path schedules on the various projects as part of the 2013 IDIQ.
The Madison VA IDIQ was a healthcare project in Madison, WI. Completed in 2014, the in excess of 100,000 sq. ft. plan had an estimated budget of $10,000,000. Provided Cost Estimating services for $15 Million worth of projects during the 2013 IDIQ program.
The Wisconsin Veterans Home was a healthcare project in Chain O’ Lakes-King, WI. Completed in 2014, the 2,000 sq. ft. plan had an estimated budget of $3,400,000. Provided Cost Estimating for the pedestrian circulation study, and subsequent addition and renovation of elevators at (4) of the campuses buildings.
The Fort HealthCare Operating Rooms was a healthcare project in Fort Atkinson, WI. Completed in 2010, the 60,000 sq. ft. plan had an estimated budget of $10,000,000. This project included a renovation of the O/R rooms, labs and pharmacy area in the main hospital. Provided Cost Estimating, Budgeting and Change Order Review.
The Wisconsin Veterans Home was a healthcare project in Chain O’ Lakes-King, WI. Completed in 2014, the 2,000 sq. ft. plan had an estimated budget of $3,400,000. Provided Cost Estimating for the pedestrian circulation study, and subsequent addition and renovation of elevators at (4) of the campuses buildings.