Our team of experienced experts will help you complete construction at the best price and make sure your project stays on track. With experienced staff members and expertise in construction management and construction cost estimating, we manage our clients’ construction costs at all design stages and for all construction disciplines.

Projects

The Fort HealthCare Operating Rooms was a healthcare project in Fort Atkinson, WI. Completed in 2010, the 60,000 sq. ft. plan had an estimated budget of $10,000,000. This project included a renovation of the O/R rooms, labs and pharmacy area in the main hospital. Provided Cost Estimating, Budgeting and Change Order Review.

The Milwaukee VA Fisher House was a healthcare project in Milwaukee, WI. Completed in 2014, the 20,000 sq. ft. plan had an estimated budget of $800,000. Provided Value Engineering and Cost Estimating services for the civil and utility work required for the addition of the Fisher House.

The Wisconsin Veterans Home was a healthcare project in Chain O’ Lakes-King, WI. Completed in 2014, the 2,000 sq. ft. plan had an estimated budget of $3,400,000. Provided Cost Estimating for the pedestrian circulation study, and subsequent addition and renovation of elevators at (4) of the campuses buildings.

The Madison VA IDIQ was a healthcare project in Madison, WI. Completed in 2014, the in excess of 100,000 sq. ft. plan had an estimated budget of $10,000,000. Provided Cost Estimating services for $15 Million worth of projects during the 2013 IDIQ program.

The Madison VA Medical Center was a healthcare project in Madison, WI. Completed in 2014, the In excess of 100,000 sq. ft. plan had an estimated budget of $10,000,000+. Engaged by the design team. Provided critical path schedules on the various projects as part of the 2013 IDIQ.

The Tomah VA Medical Center was a healthcare project in Tomah, WI. Completed in 2014, the 20,000 sq. ft. plan had an estimated budget of $400,000. Provided critical path schedules for the design team on the Water Meter Integration Project.

The Syracuse VA Medical Center was a healthcare project in Syracuse, NY. Completed in 2015, the 20,000 sq. ft. plan had an estimated budget of $9,000,000. Throughout the development and construction design phases of the 4th floor renovation of the community based living center,we provided Cost Estimating services.

The Milwaukee VA Generator was a healthcare project in Milwaukee, WI. Completed in 2015, the 1,200 sq. ft. plan had an estimated budget of $4,000,000. This project consisted of the addition of Building 144’s Generator Facility. Provided Cost Estimating services.

The Milwaukee VA Medical Center was a healthcare project in Milwaukee, WI. Completed in 2015, the 15,000 sq. ft. plan had an estimated budget of $2,300,000. Worked with the Owner and Contractor to provide cost loaded critical path schedules for the multi-phased prosthetics renovation.

The Madison VA ICU was a healthcare project in Madison, WI. Completed in 2015, the 30,000 sq. ft. plan had an estimated budget of $8,000,000. Provided General Contracting services for the $8 Million ICU consolidation and expansion project.

The St. Joe’s Medical Center was a healthcare project in Hobart, Indiana. Completed in 2015, the 60,000 sq. ft. plan had an estimated budget of $23,000,000. Provided Feasibility Studies and Cost Engineering Solutions for the expansion of the facilities operating and emergency departments.

The Ann Arbor VA Medical Center was a healthcare project in Ann Arbor, MI. Completed in 2016, the 40,000 sq. ft. plan had an estimated budget of $7,800,000. Provided Cost Estimating services and phasing review for the renovation and expansion of the facilities front entrance and outpatient clinic areas.

The Amarillo VA Medical Center was a healthcare project in Amarillo, TX. Completed in 2016, the 45,000 sq. ft. plan had an estimated budget of $8,000,000. Provided Value Engineering and Cost Estimating services for all phases of the campus’ community based living center.

The Prescott VA Medical Center was a healthcare project in Prescott, AZ. Completed in 2016, the 2,000 sq. ft. plan had an estimated budget of $3,400,000. Provided Feasibility Studies and Cost Estimating services for the replacement of campus’ emergency power systems.

The Fort HealthCare Hospital was a healthcare project in Fort Atkinson, WI. Completed in 2019, the 400,000 sq. ft. plan had an estimated budget of $100,000,000. Campus Regeneration Study: Provided Conceptual Cost Estimates for the potential re-location of a rural hospital.

The McCalmont Residence Hall Renovation was an education project in Stout, WI. Completed in 2014, the 67,000 sq. ft. plan had an estimated budget of $7,900,000. This project at University of Wisconsin – Stout, included an addition and remodel of the freshman residence hall. Provided Cost Estimating and Value Engineering services.

The UW Whitewater Residence Halls was an education project in Whitewater, WI. Completed in 2015, the 108,000 sq. ft. plan had an estimated budget of $12,000,000. This project consisted of the renovation of multiple student residence buildings at University of Wisconsin – Whitewater dating from the mid 1960’s with a focus on code and ADA […]

The Pike River Dormitory was an education project in Kenosha, WI. Completed in 2009, the 120,000 sq. ft. plan had an estimated budget of $12,000,000. Provided Cost Estimating and Bidding services to the general contractor for the Pike River Suites Dormitory at University of Wisconsin – Parkside. Additionally, we provided value engineering options to the […]

The UW Hospital Parking Ramp was an education project in Madison, WI. Completed in 2015, the 130,000 sq. ft. plan had an estimated budget of $26,000,000. This project consists of an expansion to the UW Hospital Parking Ramp with additions to the south and east side of the existing ramp. Engaged to provide Cost Estimating […]

The UW Lacrosse Utility Building was an education project in Lacrosse, WI. Completed in 2016, the 6,540 sq. ft. plan had an estimated budget of $2,500,000. Provided Cost Estimating services for the addition and expansion of the chilled water plant at University of Wisconsin – Lacrosse.

The UW Parking Expansion was an education project in La Crosse, WI. Completed in 2016, the 120,000 sq. ft. plan had an estimated budget of $7,600,000. The University of Wisconsin was granted permission to add two new levels to its new campus parking ramp. Provided Cost Estimating services and Scheduling input for the campus.

The Debot Hall Dining Facility was an education project in Stevens Point, WI. Completed in 2018, the 56,820 sq. ft. plan had an estimated budget of $10,000,000. Provided Cost Estimating services for the study of the renovation for the Debot Hall Dining Facility at University of Wisconsin – Stevens Point.

The UW School of Engineering was an education project in Platteville, WI. Completed in 2020, the 400,000 sq. ft. plan had an estimated budget of $60,000,000. Provided Cost Estimating services and Value Engineering options for the renovation and additions to four academic buildings on the University of Wisconsin – Platteville campus.

The University of Illinois at Chicago Engineering Innovation Building was an education project in Chicago, Illinois. Completed in 2019, the 57,500 sq. ft. plan had an estimated budget of $31,893,950. For students of the engineering, mechanical engineering, and civil engineering departments, the University of Illinois at Chicago’s new Engineering Innovation Building provides many different research […]

The UW Milwaukee Chemistry Building & Central Utilities Expansion was an education project in Milwuakee, Wisconsin. Completed in 2022, the 155,340 sq. ft. plan had an estimated budget of $129,535,000. This project constructs a new academic and research chemistry and bio-chemistry facility to provide instructional laboratories and associated support spaces, research laboratories, associated support spaces, […]

The UW Milwaukee Klotsche Center Annex Addition was an education project in Milwaukee, Wisconsin. Completed in 2022, the 17,342 sq. ft. plan had an estimated budget of $5,927,091. This project constructs a new one-court gymnasium with shell space for future multi-purpose and fitness and strength conditioning areas. It is anticipated that the addition will be […]

The UIC Computer Research Design and Learning Center was an education project in Chicago, Illinois. Completed in 2022, the 135,000 sq. ft. plan had an estimated budget of $76,336,168. This project will construct a new four-story building to be primarily occupied by the University’s Computer Science department. The new facility will include auditoriums and lecture […]

The UW Madison’s Meat Science and Animal Biologics Discovery Building was an education project in Madison, Wisconsin. Completed in 2020, the 72,784 sq. ft. plan had an estimated budget of $36,088,175. University of Wisconsin Madison’s Meat Science and Animal Biologics Discovery (MSABD) building brings much-needed modernization to the school’s College of Agricultural and Life Sciences. […]

The UW Madison Sellery & Witte Residence Halls Renovation was an education project in Madison, Wisconsin. Completed in 2019, the 287,324 sq. ft. plan had an estimated budget of $52,797,000. Witte Residence Hall, which opened in 1964, was a two-tower structure that was home to 1,150 residents in double rooms. University Housing planned a major […]

The UW Madison Chemistry Building Instructional Addition and Renovation was an education project in Madison, Wisconsin. Completed in 2022, the 245,840 sq. ft. plan had an estimated budget of $133,100,000. The project consists of the design and construction of a new eight-story undergraduate chemistry teaching tower, the renovation of existing undergraduate laboratories and offices in […]

The Nicholas Recreation Center was an education project in Madison, WI. Completed in 2020, the 250,800 sq. ft. plan had an estimated budget of $65,871,200 . The Nicholas Recreation Center (Nick) is a new state-of-the-art facility where the Southeast Recreational Facility (the SERF building) used to be.The SERF building, one of UW Madison’s Rec Sports […]

The Airport Snow Removal Facility was a municipality project in Madison, WI. Completed in 2013, the 58,800 sq. ft. plan had an estimated budget of $14,000,000. This Green Certified building at the Dane County Regional Airport includes a new storage facility for the airport snow removal equipment and includes a geothermal heating/cooling system. Provided Cost […]

The La Crosse Regional Airport was a municipality project in La Crosse, WI. Completed in 2014, the 60,000 sq. ft. plan had an estimated budget of $1,300,000. Provided Cost Estimating services and assisted in bid preparation for the exterior renovations and upgrades to the regional airport.

The Manhattan Regional Airport was a municipality project in Manhattan, KS. Completed in 2014, the 24,000 sq. ft. plan had an estimated budget of $12,000,000. This $12 Million project included the expansion and renovation of the Manhattan Regional Airport. Provided Cost Estimating services, phasing, and feasibility review.

The Green Bay Airport was a municipality project in Green Bay, WI. Completed in 2015, the 5,700 sq. ft. plan had an estimated budget of $1,700,000. Conducted pre-design feasibility and design estimates for the addition and renovation of the Green Bay International Airports Customs and Border Protection office.

The DNA Lab, Wisconsin DOJ was a municipality project in Madison, WI. Completed in 2015, the 20,000 sq. ft. plan had an estimated budget of $5,100,000. Provided pre-construction and construction-level estimates for the renovation of the state-of-the-art facility.

The Madison Municipal Building was a municipal project in Madison, WI. Completed in 2018, the 74,880 sq. ft. plan had an estimated budget of $30,200,00. Home to many of Madison’s essential city employees and listed on the National Register of Historic Places, Madison’s Municipal Building, located at 215 Martin Luther King Jr Blvd, received some […]

The “Deep Space” Auditorium was a commercial project in Verona, WI. Completed in 2013, the 600,000 sq. ft. plan had an estimated budget of $200,000,000. This 11,000-seat auditorium project included preliminary schematic budgets and detailed quantity surveys for Epic System’s “Deep Space” building.

The Hilldale Mall was a commercial project in Madison, WI. Completed in 2015, the 60,000 sq. ft. plan had an estimated budget of $6,000,000. Provided Cost Estimating and Value Engineering services for the multi-phased renovation and expansion of the retail mall.

The Epic Systems, Campus III was a commercial project in Verona, WI. Completed in 2016, the 400,000 sq. ft. plan had an estimated budget of $200,000,000. Provided Conceptual and Schematic Budgets for the Epic Campus III project. The project consisted of six office buildings and two underground parking facilities for the software developer.

The Illinois State Fair Coliseum was a commercial project in Springfield, Illinois. Completed in 2019, the 44,900 sq. ft. plan had an estimated budget of $10,770,945. Originally constructed in 1901 and listed on the National Register of Historic Places, “The Coliseum of Champions” at the Illinois State Fairgrounds has hosted many events, including concerts, horse […]

The Fort HealthCare Operating Rooms was a healthcare project in Fort Atkinson, WI. Completed in 2010, the 60,000 sq. ft. plan had an estimated budget of $10,000,000. This project included a renovation of the O/R rooms, labs and pharmacy area in the main hospital. Provided Cost Estimating, Budgeting and Change Order Review.

The Wisconsin Veterans Home was a healthcare project in Chain O’ Lakes-King, WI. Completed in 2014, the 2,000 sq. ft. plan had an estimated budget of $3,400,000. Provided Cost Estimating for the pedestrian circulation study, and subsequent addition and renovation of elevators at (4) of the campuses buildings.